logo

NET Mexico Pipeline Project, Texas

Sector: Advanced Electronics • Location: United States

Source: Hydrocarbon Technology

Project
Closed

NET Mexico Pipeline Partners, an affiliate of NET Midstream, completed the construction of a natural gas transmission pipeline at the international boundary between the US and Mexico in Starr County, Texas, US, in November 2014. The new pipeline helps to meet the growing demands of natural gas in Mexico. Construction on the pipeline started on February 2014 and the commissioning activities conclu

Project Information FAQ

Project Information

4 Q
The project “NET Mexico Pipeline Project, Texas” is an infrastructure initiative in the Advanced Electronics sector, located in United States. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

NET Mexico Pipeline Partners, an affiliate of NET Midstream, completed the construction of a natural gas transmission pipeline at the international boundary between the US and Mexico in Starr County, Texas, US, in November 2014. The new pipeline helps to meet the growing demands of natural gas in Mexico. Construction on the pipeline started on February 2014 and the commissioning activities concluded in October 2014. The pipeline delivered first natural gas from the Agua Dulce Hub in Nueces County, Texas, to a point near Rio Grande City in Starr County, Texas, in the following month. The $665m intrastate pipeline project was financed by a consortium of lenders led by the Bank of Tokyo-Mitsubishi UFJ. Other investors in the consortium are G Capital, Credit Agricole, Natixis, the Royal Bank of Canada, Nord/LB, BBVA and Santander. NET Mexico received a presidential permit from the US Federal Energy Regulatory Commission (FERC), authorising it for limited border-crossing facilities at the international boundary between the US and Mexico. NET Mexico also operates three pipeline systems, including Eagle Ford Midstream, LaSalle Pipeline and South Shore Pipeline in the Eagle Ford Shale, in addition to the NET Mexico Pipeline. The intrastate pipeline project involved the construction of a 200km-long (124 miles), 42in-diameter, non-jurisdictional, intrastate pipeline. The design capacity of the pipeline is 2.3 billion cubic feet a day (Bcf/d), which can be increased to 3Bcf/d with associated compression. The pipeline will initially operate with 50,000HP of compression, which will be subsequently increased to 114,000HP by the end of 2015. NET Mexico’s Agua Dulce Hub can receive more than 4Bcf/d of gas from nine gas pipelines and four gas processing plants. It also includes three large-diameter header systems and bi-directional meters at multiple points, with a capacity of 2.6Bcf/d. NET Mexico also plans to subscribe to a 700,000MMBtu/d compression expansion of the pipeline. The new pipeline initially operates with a capacity of 2.1Bcf/d and a maximum allowable operating pressure of 1,480 pounds per square inch gauge (psig). A 860km-long pipeline will import up to 2.1bn cubic feet a day of natural gas from the US to Mexico. NET Mexico signed a long-term gas transportation agreement for its full initial capacity with MGI Supply, an indirect wholly-owned subsidiary of Mexican state-owned gas company, Pemex Gas y Petroquimica Basica. The construction of the NET Mexico Pipeline required approximately 8.2 acres of land, 0.3 acres of which was used for permanent operations of the project and the remaining 7.9 acres for preconstruction. NET Mexico Pipeline Partners required approximately 3.4 acres for a temporary access road and 4.5 acres for temporary workspace. The project required the construction of an approximately 1,400ft of 42in-diameter, non-jurisdictional, intrastate natural gas pipeline. The pipeline was installed using horizontal directional drilling (HDD) below the Rio Grande River in Starr County, Texas. The company also constructed approximately 1,247ft of 48in-diameter pipeline on the Mexican side of the border, which will be owned and operated by Los Ramones. In November 2013, energy infrastructure contractor Willbros was awarded the construction contract for the NET Mexico Pipeline. NET Holdings Management subsidiary NET Midstream placed an order with Voith for four Vorecons with dual-torque converters in March 2014. These Vorecon dual-torque converters controls speeds with power ranging from 6MW to 50MW. Laurini supplied pipeline machinery, including its self-loading Superscreen and SuperPadder, for the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data