logo
ProjectPlanned

Net Zero Teesside Power Plant

The owner, status and timeline of this project. A free account opens every field.

Source: BBC

The Net Zero Teesside Power Plant is a planned gas power station that aims to utilize carbon-capture technology to significantly reduce greenhouse gas emissions. It is expected to generate up to 860 megawatts of low-carbon electricity, with at least 90% of its emissions captured and stored beneath the North Sea.

Status
Prospective
Sector
Power Generation (CCGT)
Location
Redcar, England, United Kingdom
Updated
22 Jul 2026
Source
BBC

ConstructChat

Ask ConstructChat about Net Zero Teesside Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Net Zero Teesside Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Redcar, England, United Kingdom. Taiyo aggregates data on it from BBC.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Net Zero Teesside Power Plant is a planned gas power station that aims to utilize carbon-capture technology to significantly reduce greenhouse gas emissions. It is expected to generate up to 860 megawatts of low-carbon electricity, with at least 90% of its emissions captured and stored beneath the North Sea.

Original sector

Energy

Location

Country

United Kingdom (UK)

State

England

City

Redcar

Source

Source

BBC

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project