Net Zero Teesside Power Project
The owner, status and timeline of this project. A free account opens every field.
Source: ChemAnalyst
The Net Zero Teesside Power project is a joint venture between BP and Equinor to build the world's first gas-fired power plant with an integrated carbon capture unit in northeast England. The project aims to generate up to 740 megawatts of low-carbon power and capture two million tonnes of CO2 annually for permanent offshore storage in the North Sea, supporting the UK's net-zero emissions targets.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- ChemAnalyst
ConstructChat
Ask ConstructChat about Net Zero Teesside Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Net Zero Teesside Power project is a joint venture between BP and Equinor to build the world's first gas-fired power plant with an integrated carbon capture unit in northeast England. The project aims to generate up to 740 megawatts of low-carbon power and capture two million tonnes of CO2 annually for permanent offshore storage in the North Sea, supporting the UK's net-zero emissions targets. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
Source
Source | ChemAnalyst |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
