logo
ProjectPlanned

Net Zero Teesside Power Station

One of 10,000+ projects Taiyo tracks in England.

Source: BBC

The Net Zero Teesside Power Station is planned to be developed at the Teesworks site near Redcar. It aims to utilize carbon-capture technology to significantly reduce greenhouse gas emissions, with a goal of capturing at least 90% of its emissions and generating up to 860 megawatts of low-carbon electricity.

Status
Prospective
Sector
Power Generation (CCGT)
Location
Redcar, England, United Kingdom
Updated
22 Jul 2026
Source
BBC

ConstructChat

Ask ConstructChat about Net Zero Teesside Power Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Net Zero Teesside Power Station” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Redcar, England, United Kingdom. Taiyo aggregates data on it from BBC.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Net Zero Teesside Power Station is planned to be developed at the Teesworks site near Redcar. It aims to utilize carbon-capture technology to significantly reduce greenhouse gas emissions, with a goal of capturing at least 90% of its emissions and generating up to 860 megawatts of low-carbon electricity.

Original sector

Energy

Location

Country

United Kingdom (UK)

State

England

City

Redcar

Source

Source

BBC

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project