NETHERLANDS FLOOD DEFENSE PPP
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project consists of the reinforcement of the Afsluitdijk dyke body and the sluices and locks at Den Oever and Kornwerderzand so as to withstand a storm with a probability of 1/10 000 years, until at least halfway through this century. Pumps will be installed within the sluice complex at Den Oever to ensure the availability of drainage capacity even at times when sluicing is not possible. The p
- Status
- Under Construction
- Sector
- Road, Aerospace & Defense, Water Supply and Storage, Government, Waste Processing and Treatment
- Location
- Netherlands
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about NETHERLANDS FLOOD DEFENSE PPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the reinforcement of the Afsluitdijk dyke body and the sluices and locks at Den Oever and Kornwerderzand so as to withstand a storm with a probability of 1/10 000 years, until at least halfway through this century. Pumps will be installed within the sluice complex at Den Oever to ensure the availability of drainage capacity even at times when sluicing is not possible. The project includes a small component of road improvement and maintenance to the National Motorway A7. The project is situated at the northern part of the Netherlands, running from Den Oever on Wieringen in North Holland province and providing flood protection from the Wadden Sea. |
Original sector | Transport, Water, sewerage |
Procurement method |
Location
Country | Netherlands |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road, Aerospace & Defense, Water Supply and Storage, Government, Waste Processing and Treatment |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
