Network Rail Bridge Preservation Project in Oxfordshire
Sector: Bridge • Location: Steventon, United Kingdom
Source: Highways Today
A Grade II listed bridge in Steventon, Oxfordshire, has been saved after innovative testing and the introduction of a new speed limit by Network Rail means it no longer has to be replaced as part of electrification. The bridge over the Great Western Main Line was originally planned to be demolished and replaced with a higher bridge to allow overhead wires, needed to run trains in electric, to pass
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A Grade II listed bridge in Steventon, Oxfordshire, has been saved after innovative testing and the introduction of a new speed limit by Network Rail means it no longer has to be replaced as part of electrification. The bridge over the Great Western Main Line was originally planned to be demolished and replaced with a higher bridge to allow overhead wires, needed to run trains in electric, to pass underneath enabling trains to run at 125mph. However, following feedback from the community about how this would impact the village, Network Rail carried out state-of-the-art testing to see if the bridge could be saved. This extensive and breakthrough testing, which included the use of computer-based simulation software, found that if the line speed of the railway was reduced to 110mph through Steventon, the wires could pass underneath the existing bridge. This is the safest maximum speed that the overhead electric wires can be used continuously for the everyday running of the railway. This is because the electric wires need to dip under the bridge and rise again the other side. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
