logo

Network Rail Bridge Preservation Project in Oxfordshire

Sector: Bridge • Location: Steventon, United Kingdom

Source: Highways Today

Project
Ongoing

A Grade II listed bridge in Steventon, Oxfordshire, has been saved after innovative testing and the introduction of a new speed limit by Network Rail means it no longer has to be replaced as part of electrification. The bridge over the Great Western Main Line was originally planned to be demolished and replaced with a higher bridge to allow overhead wires, needed to run trains in electric, to pass

Project Information FAQ

Project Information

4 Q
The project “Network Rail Bridge Preservation Project in Oxfordshire” is an infrastructure initiative in the Bridge sector, located in Steventon, United Kingdom. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A Grade II listed bridge in Steventon, Oxfordshire, has been saved after innovative testing and the introduction of a new speed limit by Network Rail means it no longer has to be replaced as part of electrification. The bridge over the Great Western Main Line was originally planned to be demolished and replaced with a higher bridge to allow overhead wires, needed to run trains in electric, to pass underneath enabling trains to run at 125mph. However, following feedback from the community about how this would impact the village, Network Rail carried out state-of-the-art testing to see if the bridge could be saved. This extensive and breakthrough testing, which included the use of computer-based simulation software, found that if the line speed of the railway was reduced to 110mph through Steventon, the wires could pass underneath the existing bridge. This is the safest maximum speed that the overhead electric wires can be used continuously for the everyday running of the railway. This is because the electric wires need to dip under the bridge and rise again the other side.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data