logo
ProjectUnder Construction

NeuConnect Interconnector Project

Sector: Power Generation (CCGT) • Location: Germany

Source: NatLawReview.com

The NeuConnect interconnector will create the first direct power link between Germany and the UK, allowing trading of electricity between the two countries. It involves the construction of 725 km long terrestrial and subsea 525 kV HVDC cables, with a transmission capacity of 1.4 GW, sufficient to power 1.5 million homes.

Status
Under Construction
Sector
Power Generation (CCGT)
Location
Germany
Updated
22 Jul 2026
Source
NatLawReview.com

ConstructChat

Ask ConstructChat about NeuConnect Interconnector Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NeuConnect Interconnector Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Germany. Taiyo aggregates data on it from NatLawReview.com.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The NeuConnect interconnector will create the first direct power link between Germany and the UK, allowing trading of electricity between the two countries. It involves the construction of 725 km long terrestrial and subsea 525 kV HVDC cables, with a transmission capacity of 1.4 GW, sufficient to power 1.5 million homes.

Original sector

Energy

Budget

Location

Country

Germany

Source

Source

NatLawReview.com

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project