Neuroscience Building, University of Miami
Sector: Commercial • Location: Thailand
Source: Pharmaceutical Technology
The University of Miami began construction of a new neuroscience facility at the Coral Gables campus in April 2012. Neuroscience facility Coral Gables campus, University of Miami April 2012 Arellano Construction and Tropic Mechanical End of 2013 The National Institutes of Health (NIH) The University of Miami The University of Miami began construction of a new neuroscience facility at the Coral Ga
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The University of Miami began construction of a new neuroscience facility at the Coral Gables campus in April 2012. Neuroscience facility Coral Gables campus, University of Miami April 2012 Arellano Construction and Tropic Mechanical End of 2013 The National Institutes of Health (NIH) The University of Miami The University of Miami began construction of a new neuroscience facility at the Coral Gables campus in April 2012. It is located adjacent to the Cox Science Centre at the University campus. The new facility is currently under construction and is expected to be ready by the end of 2013. It will provide great collaboration for scientists in the field to discover the neurological processes and related diseases, upon completion. The new neuroscience building will be located in a three-story building with a total floor space of 37,700ft². It will be used as a centre for interdisciplinary research on neurological imaging and health research. It will have ample space for research laboratories, offices, a vivarium and an MRI suite. The facility will enable the scientists from biology and psychology departments of the university to collaborate with the Miller School of Medicine. Scientists, clinicians and engineers will work together on fundamental aspects of brain function at the new facility. The building will include a transformational facility and also provide training programmes for neuroscientists and health psychologists. The laboratory will be used for diagnosing and treating myriad neurological diseases. The neuroscience building is installed with advanced functional magnetic resonance imaging equipment. It has a human functional magnetic resonance imaging (fMRI) scanner. It was hoisted into place and positioned within a specially shielded room on the first level of the building. The latest in molecular imaging is installed at the second floor of the building. The floor will also include a photon-based microscope for observing living proteins at work, plus a variety of cutting-edge microscopes for the research. The advanced laboratory equipment will enable neuroscientists to study how molecular changes in the nervous system relate to behaviour. The equipment will enable scientists to analyse molecular patterns in the nervous system to predict successful treatment of neurological diseases. The research programmes in the facility will be equipped to study model systems in animals. The studies on animals can be correlated with human behaviour to find functional changes in different regions of the brain. The laboratories will be equipped with sophisticated systems to track the nerve cell activity and make real time connections to human behaviour in order to study the brain. The neuroscience building at the University of Miami broke ground for construction in April 2012. It is scheduled to be completed and become operational by the end of 2013. The pre-construction and construction services contract for neuroscience facility was awarded to Arellano Construction, a subsidiary of Obrascon Huarte Lain. Tropic Mechanical was awarded with a $5m worth contract to provide state-of-the-art laboratory at the neuroscience facility. The work was completed in March 2013. The building is being constructed in compliance with LEED Silver green-building standards. It is designed to be environmentally sustainable. The National Institutes of Health (NIH) contributed $14.8m grant under the American Recovery and Reinvestment Act for the construction of the neuroscience building in February 2010. Pharmavite officially opened a new dietary supplement manufacturing facility in the US in June 2013. Promega Corporation began construction of a support regulated product manufacturing facility at Feynman Centre in the city of Fitchburg, Wisconsin, in August 2011. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
