logo

Neusberg Hydro Electric Plant

Sector: Hydro • Location: South Africa

Source: World Bank Group

Project
Active

10MW Neusberg Hydro Electric Plant reached financial closure by securing a syndicated loan of US$42.62 million arranged by Nedbank (50%) and Industrial Development Corporation (50%).

This BOT project would involve the development of a run-of-river hydroelectric power plant with an installed capacity of 10 MW . The produced electricity from this BOO project would be supplied to and sold to the nat

Project Information FAQ

Project Information

5 Q
The project “Neusberg Hydro Electric Plant” is an infrastructure initiative in the Hydro sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

10MW Neusberg Hydro Electric Plant reached financial closure by securing a syndicated loan of US$42.62 million arranged by Nedbank (50%) and Industrial Development Corporation (50%). This BOT project would involve the development of a run-of-river hydroelectric power plant with an installed capacity of 10 MW . The produced electricity from this BOO project would be supplied to and sold to the national grid of Eskom via a Power Purchase Agreement under “Independent Power Producer Procurement Program (IPPPP). The estimated total cost of the project amounts to USD56 million and would consist of three turbines and the associated infrastructure. The project company of the project is Kakamas Hydro Electric Power, a consortium comprising Hydro Tasmania, Old Mutual and the Kakamas Community Trust funded by the Industrial Development Corporation. In October 2013, Entura officially started construction of the project and the scope of work would encompass the whole lifecycle of the project from design through construction and ongoing support for the operation and maintenance after completion in January 2015. This project was expected to generate 71.9 GWh of base load energy per year with a capacity factor of 82%, enough to provide power to around 5,000 households. http://www.esi-africa.com/wp-content/uploads/i/p/Nick-West_Hydro.pdf USD1 = ZAR 9.655056069

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data