logo

Neusberg Hydro Electric Plant

Sector: Hydro • Location: South Africa

Source: World Bank Group

Project
Active

10MW Neusberg Hydro Electric Plant reached financial closure by securing a syndicated loan of US$42.62 million arranged by Nedbank (50%) and Industrial Development Corporation (50%).

This BOT project would involve the development of a run-of-river hydroelectric power plant with an installed capacity of 10 MW . The produced electricity from this BOO project would be supplied to and sold to the nat

Status
Prospective
Sector
Hydro, Consumer Products, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Neusberg Hydro Electric Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Neusberg Hydro Electric Plant” is an infrastructure initiative in the Hydro sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

10MW Neusberg Hydro Electric Plant reached financial closure by securing a syndicated loan of US$42.62 million arranged by Nedbank (50%) and Industrial Development Corporation (50%). This BOT project would involve the development of a run-of-river hydroelectric power plant with an installed capacity of 10 MW . The produced electricity from this BOO project would be supplied to and sold to the national grid of Eskom via a Power Purchase Agreement under “Independent Power Producer Procurement Program (IPPPP). The estimated total cost of the project amounts to USD56 million and would consist of three turbines and the associated infrastructure. The project company of the project is Kakamas Hydro Electric Power, a consortium comprising Hydro Tasmania, Old Mutual and the Kakamas Community Trust funded by the Industrial Development Corporation. In October 2013, Entura officially started construction of the project and the scope of work would encompass the whole lifecycle of the project from design through construction and ongoing support for the operation and maintenance after completion in January 2015. This project was expected to generate 71.9 GWh of base load energy per year with a capacity factor of 82%, enough to provide power to around 5,000 households. http://www.esi-africa.com/wp-content/uploads/i/p/Nick-West_Hydro.pdf USD1 = ZAR 9.655056069

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Consumer Products, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project