Neutron Transformation Doping (NTD) Facility Construction Project
Planned · Jordan · Last reported Jul 2026
Source: 매일경제
The Korea Atomic Energy Research Institute has been selected as the preferred bidder to build a core facility for the production of Jordanian semiconductor materials. The project involves the design, construction, commissioning, and operation education and training of the NTD facility attached to the Jordan Research Reactor. This is the first export of NTD facility technology overseas and is value
- Status
- Prospective
- Sector
- Advanced Electronics, Nuclear, Education, Power Generation (CCGT)
- Location
- Jordan
- Updated
- 19 Nov 2026
- Source
- 매일경제
ConstructChat
Ask ConstructChat about Neutron Transformation Doping (NTD) Facility Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Korea Atomic Energy Research Institute has been selected as the preferred bidder to build a core facility for the production of Jordanian semiconductor materials. The project involves the design, construction, commissioning, and operation education and training of the NTD facility attached to the Jordan Research Reactor. This is the first export of NTD facility technology overseas and is valued at over 10 billion won. |
Original sector | Nuclear Research |
Budget |
Location
Country | Jordan |
Source
Source | 매일경제 |
URL |
More Details
Record type | Project |
Sector | Advanced Electronics, Nuclear, Education, Power Generation (CCGT) |
Article published date | 2026-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
