logo

Nevada North Lithium Project

Sector: Energy Storage • Location: Nevada, United States

Source: CarbonCredits.com

Project
Under Development

The Nevada North Lithium Project (NNLP) is a high-grade lithium clay resource in the United States, with a mineral resource estimate of 11.24 million tonnes of lithium carbonate equivalent (LCE) grading 3,010 ppm lithium at a 1,250 ppm cutoff. The project is progressing toward a Pre-Feasibility Study targeted for completion in late 2026, led by global engineering firm Fluor Corporation. It aims to

Status
Prospective
Sector
Energy Storage
Location
Nevada, United States of America
Updated
22 Jul 2026
Source
CarbonCredits.com

ConstructChat

Ask ConstructChat about Nevada North Lithium Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nevada North Lithium Project” is an infrastructure initiative in the Energy Storage sector, located in Nevada, United States. Taiyo aggregates data on it from CarbonCredits.com.

Participants

Not available for this record.

Status

Original status

under development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Nevada North Lithium Project (NNLP) is a high-grade lithium clay resource in the United States, with a mineral resource estimate of 11.24 million tonnes of lithium carbonate equivalent (LCE) grading 3,010 ppm lithium at a 1,250 ppm cutoff. The project is progressing toward a Pre-Feasibility Study targeted for completion in late 2026, led by global engineering firm Fluor Corporation. It aims to produce an average of 86,300 tonnes of LCE annually, peaking at 109,100 tonnes in Year 6, with operating costs estimated at US$5,243 per tonne of LCE.

Original sector

Mining

Budget

Location

Country

United States of America (USA)

State

Nevada

Source

Source

CarbonCredits.com

URL

More Details

Record type

Project

Sector

Energy Storage

Article published date

2026-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project