Neves Lithium Project
Sector: Electric Vehicles (EVs) • Location: Jequitinhonha Valley, Minas Gerais, Brazil
Source: Investing News Network
The Neves Project is a fully permitted, vertically integrated mining and processing industrial complex owned 100% by Atlas Lithium. It is designed to produce approximately 150,000 tonnes of high-quality lithium oxide concentrate per year, serving the global battery supply chain for electric vehicles and energy storage systems. The project is located in the Jequitinhonha Valley, Minas Gerais State,
- Status
- Under Construction
- Sector
- Electric Vehicles (EVs), Energy Storage, Manufacturing (Industrial), Warehouse, Automotive, Commercial
- Location
- Jequitinhonha Valley, Minas Gerais, Brazil
- Updated
- 22 Jul 2026
- Source
- Investing News Network
ConstructChat
Ask ConstructChat about Neves Lithium Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Neves Project is a fully permitted, vertically integrated mining and processing industrial complex owned 100% by Atlas Lithium. It is designed to produce approximately 150,000 tonnes of high-quality lithium oxide concentrate per year, serving the global battery supply chain for electric vehicles and energy storage systems. The project is located in the Jequitinhonha Valley, Minas Gerais State, Brazil, and is expected to generate over 5,000 direct and indirect jobs, with a focus on local hiring and training. |
Original sector | Mining |
Location
Country | Brazil |
State | Minas Gerais |
City | Jequitinhonha Valley |
Source
Source | Investing News Network |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Energy Storage, Manufacturing (Industrial), Warehouse, Automotive, Commercial |
Article published date | 2026-07-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
