Nevis Geothermal Power Plant Phase 1
Sector: Geothermal • Location: Nevis, Saint Kitts and Nevis
Source: inkl
Development of a 10-to-30-megawatt geothermal power plant on Nevis Island to meet the entire domestic electricity demand, reduce electricity costs, and provide stable renewable energy. The project includes drilling production and reinjection wells as part of Phase 1, with potential for future expansion.
- Status
- Prospective
- Sector
- Geothermal, Power Generation (CCGT), Government
- Location
- Nevis, Saint Kitts and Nevis
- Updated
- 22 Jul 2026
- Source
- inkl
ConstructChat
Ask ConstructChat about Nevis Geothermal Power Plant Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Development of a 10-to-30-megawatt geothermal power plant on Nevis Island to meet the entire domestic electricity demand, reduce electricity costs, and provide stable renewable energy. The project includes drilling production and reinjection wells as part of Phase 1, with potential for future expansion. |
Original sector | Energy |
Budget |
Location
Country | Saint Kitts and Nevis |
City | Nevis |
Source
Source | inkl |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Government |
Article published date | 2026-03-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
