New 16" Transmission Line
Sector: Water Supply and Storage • Location: Port Arthur, Texas, United States of America
Source: Dodge
Project includes a new 16" transmission line along Pleasure Island from the existing 24" at the MLK Bridge to the new 12" crossing for Gulf Pump Station. The City of Port Arthur may be seeking a consultant to provide Planning and Design for new 16" transmission line along Pleasure Island from the existing 24" at the MLK Bridge to the new 12" crossing for Gulf Pump Station
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Bridge, Seaport, Waste Processing and Treatment, Commercial
- Location
- Port Arthur, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New 16" Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes a new 16" transmission line along Pleasure Island from the existing 24" at the MLK Bridge to the new 12" crossing for Gulf Pump Station. The City of Port Arthur may be seeking a consultant to provide Planning and Design for new 16" transmission line along Pleasure Island from the existing 24" at the MLK Bridge to the new 12" crossing for Gulf Pump Station |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Port Arthur |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Bridge, Seaport, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
