New 8 Non-Potable Water Pipeline
Sector: Water Supply and Storage • Location: Tucson, Arizona, United States of America
Source: Dodge USA
This projectconsists of work including, but not limited to, construction of 4,366 linearfeet of non-potable waterline, installation of a new pressure sustaining valvemanifold, installation of a filtration station, modification of the existingbooster station at the Pascua Yaqui Wellness Center, and improvement of anexisting flow control valve tied to a CAP turnout station.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Tucson, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New 8 Non-Potable Water Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This projectconsists of work including, but not limited to, construction of 4,366 linearfeet of non-potable waterline, installation of a new pressure sustaining valvemanifold, installation of a filtration station, modification of the existingbooster station at the Pascua Yaqui Wellness Center, and improvement of anexisting flow control valve tied to a CAP turnout station. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Tucson |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project