New 9/11 Memorial Monument REBID
Design development · California · Last reported Dec 2023
Source: Dodge USA
of Services Construction of a monument at an existing traffic circle/water fountain incorporating a 18 long beam from the World Trade Center debris. Project will include the construction of landscape improvements, steel structures, lighting, irrigation, electrical, drainage, restoring all improvements (paving, striping, sidewalk, landscape, etc.) to pre-construction conditions and all work require
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Car parking, Power Generation (CCGT), Steel, Government, Automotive, Metal, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Fontana, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New 9/11 Memorial Monument REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | of Services Construction of a monument at an existing traffic circle/water fountain incorporating a 18 long beam from the World Trade Center debris. Project will include the construction of landscape improvements, steel structures, lighting, irrigation, electrical, drainage, restoring all improvements (paving, striping, sidewalk, landscape, etc.) to pre-construction conditions and all work required as indicated on the project plans for the 9/11 Memorial Monument Project located at the interse... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fontana |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Car parking, Power Generation (CCGT), Steel, Government, Automotive, Metal, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
