New Artesian Well System
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The scope is to drill a new artesian well near address #48 and connect to the existing distribution system so that wells 3 and 4 can be decommissioned. This new well will service 36 residences. If the yields are adequate then an additional 33 residents serviced by well 2 can be added to the new system. Prior to drilling the well a hydro-geological study will be conducted to determine the optimal l
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about New Artesian Well System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope is to drill a new artesian well near address #48 and connect to the existing distribution system so that wells 3 and 4 can be decommissioned. This new well will service 36 residences. If the yields are adequate then an additional 33 residents serviced by well 2 can be added to the new system. Prior to drilling the well a hydro-geological study will be conducted to determine the optimal location of the well. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
