New Bellevue-Redmond Road Buffered Bike Lanes
Sector: Water Supply and Storage • Location: Bellevue, Washington, United States of America
Source: Dodge
This project will add buffered bike lanes to Bel-Red Road from West Lake Sammamish Parkway to NE 30th Street. This will be accomplished by restriping the road to remove the second southbound (uphill) travel lane. The project will modify intersections to better accommodate bicyclists and pedestrians. Approximately 1000 feet of degraded stormwater pipe will be replaced, and the road will be repaved
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Car parking, Automotive, Waste Processing and Treatment, Government, Commercial
- Location
- Bellevue, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Bellevue-Redmond Road Buffered Bike Lanes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will add buffered bike lanes to Bel-Red Road from West Lake Sammamish Parkway to NE 30th Street. This will be accomplished by restriping the road to remove the second southbound (uphill) travel lane. The project will modify intersections to better accommodate bicyclists and pedestrians. Approximately 1000 feet of degraded stormwater pipe will be replaced, and the road will be repaved between WLSP and NE 40th Street. Curb ramps along Bel-Red will also be upgraded to current ADA st... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bellevue |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Automotive, Waste Processing and Treatment, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
