logo

New Brunswick Community College -Saint John Campus Redevelopment

Sector: Education • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

The New Brunswick Community College’s Saint John Campus (NBCC-SJ) is the largest of all NBCC’s campuses. NBCC SJ is home to more than 30 full-time programs, representing more than 1,800 students. Covering about 47 acres, the buildings range in age from two years to 60 years old. Buildings A and B of Grandview Campus were built in the 1960’s and house Carpentry, Industrial Mechanics, Machinist, Plu

Status
Under Construction
Sector
Education, Manufacturing (Industrial), Residential, Commercial, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about New Brunswick Community College -Saint John Campus Redevelopment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Brunswick Community College -Saint John Campus Redevelopment” is an infrastructure initiative in the Education sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The New Brunswick Community College’s Saint John Campus (NBCC-SJ) is the largest of all NBCC’s campuses. NBCC SJ is home to more than 30 full-time programs, representing more than 1,800 students. Covering about 47 acres, the buildings range in age from two years to 60 years old. Buildings A and B of Grandview Campus were built in the 1960’s and house Carpentry, Industrial Mechanics, Machinist, Plumbing, Steam fitting/Pipefitting programs, plus several student service areas. These buildings are well beyond their life expectancy and present significant challenges in a modern learning environment. The buildings do not meet current accessibility standards limiting NBCC-SJ’s ability to welcome more diverse learners, and lack modern ventilation systems to support construction and industrial trades programs. Accordingly, NBCC-SJ is planning to: 1. Expand the Industrial Trades Education Centre (2018) and relocate all trades programs from existing Buildings A, B and C. 2. Renovate the existing Building C to include upgrades to training spaces, a new lobby and atrium, new learning commons, student services relocation, and new cafeteria. 3. Demolish and decommission existing Buildings A and B to include construction of a new courtyard at their location. This proposal will allow NBCC-SJ to: Develop modern, flexible, multifunctional space; Increase their training capacity by an additional 244 students; and decrease their operating costs (estimated $350,000 annually) and deferred maintenance (estimated $34 million).

Original sector

Green Energy

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Education, Manufacturing (Industrial), Residential, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project