logo

New Bullards Bar and Oroville Dam Water Control Manual Updates

Sector: Road • Location: Sacramento, California, United States

Source: Doug LaMalfa

Project
Planned

The funding would be used to update and revise the Water Control Manuals (WCMs) for New Bullards Bar Dam and Oroville Dam, which currently operate largely off a structure created in 1970.

Status
Prospective
Sector
Road, Water Supply and Storage, Hydro, Government
Location
Sacramento, California, United States of America
Updated
22 Jul 2026
Source
Doug LaMalfa

ConstructChat

Ask ConstructChat about New Bullards Bar and Oroville Dam Water Control Manual Updates

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “New Bullards Bar and Oroville Dam Water Control Manual Updates” is an infrastructure initiative in the Road sector, located in Sacramento, California, United States. Taiyo aggregates data on it from Doug LaMalfa.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The funding would be used to update and revise the Water Control Manuals (WCMs) for New Bullards Bar Dam and Oroville Dam, which currently operate largely off a structure created in 1970.

Budget

Location

Country

United States of America (USA)

State

California

City

Sacramento

Source

Source

Doug LaMalfa

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Hydro, Government

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project