New Bus Garage
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
General Construction: Base bid is a new. 6,353 SF wood framed building with cavity insulation, exterior metal panel, on concrete footings and foundation walls. Standing seam metal roof. Hollow metal door frames with metal doors. complete with door hardware. Building includes restrooms, offices, workroom. mechanical room, maintenance bay, wash bay, and an enclosed mezzanine. Site Work: Site work co
- Status
- Closed
- Sector
- Metal, Commercial, Road, Cement, Government, Car parking, Residential, Automotive, Manufacturing (Industrial)
- Location
- Lewistown, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Bus Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General Construction: Base bid is a new. 6,353 SF wood framed building with cavity insulation, exterior metal panel, on concrete footings and foundation walls. Standing seam metal roof. Hollow metal door frames with metal doors. complete with door hardware. Building includes restrooms, offices, workroom. mechanical room, maintenance bay, wash bay, and an enclosed mezzanine. Site Work: Site work consist of heavy duty asphalt pavement, heavy duty concrete pavement, chainlink fence. bollards, fu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Lewistown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Road, Cement, Government, Car parking, Residential, Automotive, Manufacturing (Industrial) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
