New Bus Garage
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
General Construction: Base bid is a new. 6,353 SF wood framed building with cavity insulation, exterior metal panel, on concrete footings and foundation walls. Standing seam metal roof. Hollow metal door frames with metal doors. complete with door hardware. Building includes restrooms, offices, workroom. mechanical room, maintenance bay, wash bay, and an enclosed mezzanine. Site Work: Site work co
- Status
- Under Construction
- Sector
- Road, Government, Metal, Commercial, Residential, Manufacturing (Industrial), Cement, Car parking, Automotive
- Location
- Lewistown, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Bus Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General Construction: Base bid is a new. 6,353 SF wood framed building with cavity insulation, exterior metal panel, on concrete footings and foundation walls. Standing seam metal roof. Hollow metal door frames with metal doors. complete with door hardware. Building includes restrooms, offices, workroom. mechanical room, maintenance bay, wash bay, and an enclosed mezzanine. Site Work: Site work consist of heavy duty asphalt pavement, heavy duty concrete pavement, chainlink fence. bollards, fu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Lewistown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Metal, Commercial, Residential, Manufacturing (Industrial), Cement, Car parking, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
