logo

New Charging Stations Provide and Install

Sector: Commercial • Location: Hillsboro, Oregon, United States of America

Source: Dodge USA

Project
Gc Bidding

provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated con

Status
Under Construction
Sector
Commercial, Car parking, Seaport, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Government, Telecommunications, Automotive
Location
Hillsboro, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about New Charging Stations Provide and Install

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Charging Stations Provide and Install” is an infrastructure initiative in the Commercial sector, located in Hillsboro, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated conduit and cabling in bored and trenching areas. D. Provide and install the six (6) pedestal bases....

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Hillsboro

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Seaport, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Government, Telecommunications, Automotive

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project