New Charging Stations Provide and Install
Sector: Commercial • Location: Hillsboro, Oregon, United States of America
Source: Dodge USA
provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated con
- Status
- Under Construction
- Sector
- Commercial, Car parking, Seaport, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Government, Telecommunications, Automotive
- Location
- Hillsboro, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Charging Stations Provide and Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated conduit and cabling in bored and trenching areas. D. Provide and install the six (6) pedestal bases.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Hillsboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Seaport, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Government, Telecommunications, Automotive |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
