logo
ProjectClosed

New Charging Stations Provide and Install

Closed · Oregon · Last reported Nov 2024

Source: Dodge USA

provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated con

Status
Closed
Sector
Government, Telecommunications, Manufacturing (Industrial), Commercial, Car parking, Automotive, Seaport, Electric Vehicles (EVs), Power Generation (CCGT)
Location
Hillsboro, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about New Charging Stations Provide and Install

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Charging Stations Provide and Install” is an infrastructure initiative in the Government sector, located in Hillsboro, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated conduit and cabling in bored and trenching areas. D. Provide and install the six (6) pedestal bases....

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Hillsboro

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Telecommunications, Manufacturing (Industrial), Commercial, Car parking, Automotive, Seaport, Electric Vehicles (EVs), Power Generation (CCGT)

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project