New Charging Stations Provide and Install
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated con
- Status
- Closed
- Sector
- Telecommunications, Government, Manufacturing (Industrial), Automotive, Seaport, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Car parking
- Location
- Hillsboro, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Charging Stations Provide and Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | provision and installation of new ChargePoint electric vehicle charging stations. Contractor will provide as following. A. Provide and install six (6) new 60 amp breakers from two existing panels. B. Provide trenching and boring as required for the six (6) dual port charger installations. 2 Dual chargers in P3 parking lot and 4 Dual chargers in P5 parking lot. C. Provide and install associated conduit and cabling in bored and trenching areas. D. Provide and install the six (6) pedestal bases.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Hillsboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Government, Manufacturing (Industrial), Automotive, Seaport, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Car parking |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
