New Chippewa 7-8 Middle School
Sector: Commercial • Location: Meridian Charter Township, Michigan, United States of America
Source: Dodge USA
Kinawa and Chippewa Middle Schools would be replaced with two connected buildings on the Chippewa site. Fifth through sixth grade and seventh through eighth grade would remain separate with dedicated parent and bus drop-off loops yet would share some amenities such as a state-of-the-art auditorium. Additional features would include outdoor learning spaces and natural pathways throughout the site.
- Status
- Prospective
- Sector
- Commercial, Education, Government, Manufacturing (Industrial)
- Location
- Meridian Charter Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Chippewa 7-8 Middle School
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Kinawa and Chippewa Middle Schools would be replaced with two connected buildings on the Chippewa site. Fifth through sixth grade and seventh through eighth grade would remain separate with dedicated parent and bus drop-off loops yet would share some amenities such as a state-of-the-art auditorium. Additional features would include outdoor learning spaces and natural pathways throughout the site. A portion of the current Chippewa Middle School would be renovated and used as part of the new sh... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Meridian Charter Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Government, Manufacturing (Industrial) |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
