logo

New Churches St. Luke & St. Matthew / Meixner Schlüter Wendt

Sector: Road • Location: Anthony Moiba, Arno Noack, Miriam Rollwa

Source: ArchDaily

Project
Closed

To the east, the new outer church provides an additional outdoor space that unlike the church square is sheltered and introspective, whereby there is an unimpeded view upwards exclusively of trees and the sky. Like a traditional church spire, a skylight sloping towards Gersprenzweg acts as an urban highlight. The skylight creates atmospheric lighting inside the outer church, lending church service

Project Information FAQ

Project Information

3 Q
The project “New Churches St. Luke & St. Matthew / Meixner Schlüter Wendt” is an infrastructure initiative in the Road sector, located in Anthony Moiba, Arno Noack, Miriam Rollwa. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To the east, the new outer church provides an additional outdoor space that unlike the church square is sheltered and introspective, whereby there is an unimpeded view upwards exclusively of trees and the sky. Like a traditional church spire, a skylight sloping towards Gersprenzweg acts as an urban highlight. The skylight creates atmospheric lighting inside the outer church, lending church services and other events a spiritual touch. Under the skylight the altar, the ambo and the "stairway to heaven" echoes the structure of the outer church on the scale of furniture. Since both use fair-face concrete, the fit-out and the building meld. The white cross on the outside wall catches the eye thanks to its special color and materials.Text description provided by the architects.The existing ensemble consisting of a childcare facility and the Lukaskirche (Church of St. Luke) is being expanded to feature a new church square, a new parish hall, and the new outer church. The new and enlarged ensemble with the combination of old and new builds reflects the fact that in the course of advancing existing structures, the users by having to give up old builds in exchange for the new, frequently have to bid farewell to the past and try and make the new their own. The site extends, as if along a timeline, from west to east, starting with the childcare center and the existing church and moving into the new parish hall, creating a kind of "building history" which is open-ended thanks to the outer church. The latter, as a constructed intermediate state, can be read ambivalently as half-open/half-closed, and using construction to depict a process. As a realm of possibilities and as an open space in both senses it points to the future.The expansion is work divided up into three sequential zones: the church square, the parish hall, and the outer church. This continues eastwards the existing sequence of childcare facility and church on the west side of the site. To the west the new church square connects the parish hall with the existing church. It is a public square, allowing visitors to the church and parish hall to disperse easily, and encourages social gatherings such as events and festivities. Facing Brunnenweg to the south, the "street altar" opens onto the street and the urban environment, highlighting the ensemble's ecclesiastical function. The parish hall has a simple, rectangular footprint but stands out for its lengthwise orientation. To the south a skylight isrunning the entire width of the building embedding it in the urban fabric. This is the church hall: the place where the parish activities and events take place, including the church services. The edifice flattens out at an angle towards the back in line with the use of the side rooms. The hall boasts two generous floor-to-ceiling windows located opposite each other, forging a link between the square, the parish hall, and the outer church. This line of vision allows users to experience the sequencing concept for themselves.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data