New Circle Road Double Crossover Interchange Reconstruction
Sector: Road • Location: Lexington, Kentucky, United States
Source: FOX 56 News
The project involves reconstructing the New Circle Road interchange at Leestown Road into a double crossover interchange to reduce traffic congestion and improve safety. The work includes widening the interchange and converting it to a Double Crossover Diamond configuration, allowing Leestown Road to return to two lanes each direction by the end of the year.
- Status
- Under Construction
- Sector
- Road, Government
- Location
- Lexington, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- FOX 56 News
ConstructChat
Ask ConstructChat about New Circle Road Double Crossover Interchange Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves reconstructing the New Circle Road interchange at Leestown Road into a double crossover interchange to reduce traffic congestion and improve safety. The work includes widening the interchange and converting it to a Double Crossover Diamond configuration, allowing Leestown Road to return to two lanes each direction by the end of the year. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Lexington |
Source
Source | FOX 56 News |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-11-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
