New Cruise Terminal G Program
Gc bidding · Florida · Last reported Jul 2024
Source: Dodge USA
The scope of work includes, but is not limited to: Partial demolition of existing data rooms 216, 217, and 256 on second floor of Cruise Terminals E. New equipment and AV racks inside LAN room. New HVAC system inside LAN room for energy load. New UPS system inside LAN room. New rooftop condensing units. Expansion of conduits for low voltage/IT wiring across terminal, from first floor Telecom and R
- Status
- Prospective
- Sector
- Telecommunications, Government, Commercial
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Cruise Terminal G Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes, but is not limited to: Partial demolition of existing data rooms 216, 217, and 256 on second floor of Cruise Terminals E. New equipment and AV racks inside LAN room. New HVAC system inside LAN room for energy load. New UPS system inside LAN room. New rooftop condensing units. Expansion of conduits for low voltage/IT wiring across terminal, from first floor Telecom and RCC rooms to second floor LAN room. Expansion of conduits for low voltage/IT wiring across termina... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Government, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
