New Dawn Academy - Sterling Heights, MI
Sector: Road • Location: Sterling Heights, Michigan, United States of America
Source: Dodge
Second Floor Fit-out of an existing second floor space 2) Fit-out area: 5,091 sq. ft. 3) Full Second Floor area: 8,144 sq. ft. 4) Existing Construction a. New fit out on existing concrete floor b. New windows to be in-line with first story windows. New windows to match existing, 5) 3-5/8 and 6 metal stud construction with sound batts. Smoke tight construction in applicable areas 6) Fit-out Finishe
- Status
- Closed
- Sector
- Road, Metal, Education, Cement, Commercial
- Location
- Sterling Heights, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Dawn Academy - Sterling Heights, MI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Second Floor Fit-out of an existing second floor space 2) Fit-out area: 5,091 sq. ft. 3) Full Second Floor area: 8,144 sq. ft. 4) Existing Construction a. New fit out on existing concrete floor b. New windows to be in-line with first story windows. New windows to match existing, 5) 3-5/8 and 6 metal stud construction with sound batts. Smoke tight construction in applicable areas 6) Fit-out Finishes to match existing finishes, dependent upon owner approval 7) (5) five classrooms 8) (1) one boy... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Sterling Heights |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Metal, Education, Cement, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
