New Deep Well & Chemical Feed Building REBID
Sector: Water Supply and Storage • Location: Fargo, Georgia, United States of America
Source: Dodge USA
Work to be done shall consist of the construction of a permanent 550 GPM deep well and furnishing all products and performing all labor necessary to construct a chemical feed building described herein. In general, construction consists of the installation of a new deep well to the depth and diameter as required in the Construction Drawings and Technical Specifications. In general, construction sha
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Government
- Location
- Fargo, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Deep Well & Chemical Feed Building REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be done shall consist of the construction of a permanent 550 GPM deep well and furnishing all products and performing all labor necessary to construct a chemical feed building described herein. In general, construction consists of the installation of a new deep well to the depth and diameter as required in the Construction Drawings and Technical Specifications. In general, construction shall include a chemical feed building, drilling a 26 Dia. Hole, installing 20 permanent casing, 75-... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Fargo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
