New Detroit Hotel Connecting to Huntington Place
Sector: Hotel • Location: Detroit, Michigan, United States
Source: Detroit Free Press
Plans to demolish at least two downtown Detroit buildings to construct a new 600-room hotel that would connect to the Huntington Place convention center. The hotel could be 25 stories tall and is planned to be built on a block surrounded by Cass Avenue, Fort Street, Congress Street, and Washington Boulevard. Construction is expected to start in early 2027 and finish in 2029. The project is a joint
- Status
- Prospective
- Sector
- Hotel, Commercial, Road
- Location
- Detroit, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Detroit Free Press
ConstructChat
Ask ConstructChat about New Detroit Hotel Connecting to Huntington Place
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Plans to demolish at least two downtown Detroit buildings to construct a new 600-room hotel that would connect to the Huntington Place convention center. The hotel could be 25 stories tall and is planned to be built on a block surrounded by Cass Avenue, Fort Street, Congress Street, and Washington Boulevard. Construction is expected to start in early 2027 and finish in 2029. The project is a joint venture between Sterling Group and the Detroit Regional Convention Center Facility Authority, with a total cost of up to $450 million and an all-union construction project. |
Original sector | Built Sector |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Detroit |
Source
Source | Detroit Free Press |
URL |
More Details
Record type | Project |
Sector | Hotel, Commercial, Road |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
