New Diesel Power Plant Construction in Sachs Harbour
Sector: Cement • Location: Northwest Territories, Canada
Source: Infrastructure Canada
The project consists of constructing a new power plant to replace the existing plant that was originally built in 1975 and has been deemed as inefficient and past its lifespan. The Project scope includes the decommissioning and removal of the old power plant and then the construction of the new plant at the same site. The new power plant will be built on a substructure frame to reduce ground movem
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of constructing a new power plant to replace the existing plant that was originally built in 1975 and has been deemed as inefficient and past its lifespan. The Project scope includes the decommissioning and removal of the old power plant and then the construction of the new plant at the same site. The new power plant will be built on a substructure frame to reduce ground movement issues in the future, while maintaining the existing concrete pad, which will ensure the new plant is able to adapt to the impacts of climate change. Moreover, various operational elements of the old plant, such as electrical equipment, heating systems, and indoor fuel storage tanks will be updated to meet current building code requirements. During the construction, redundant mobile generation will be used in order to continue a stable electrical source so that continuity is maintained for all dependent on the power plant. The project aims to address issues of inefficiency, safety, reliability and ground stability of the existing plant by ensuring the new asset meets modern codes and standards for electrical safety, and will result in an additional 0.6 kilowatt-hour per litre of electricity generation output from the plant. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
