New Diesel Power Plant Construction in Sachs Harbour

Sector: Cement • Location: Northwest Territories, Canada

Source: Infrastructure Canada

Project
In Progress

The project consists of constructing a new power plant to replace the existing plant that was originally built in 1975 and has been deemed as inefficient and past its lifespan. The Project scope includes the decommissioning and removal of the old power plant and then the construction of the new plant at the same site. The new power plant will be built on a substructure frame to reduce ground movem

Project Information FAQ

Project Information

5 Q
The project “New Diesel Power Plant Construction in Sachs Harbour” is an infrastructure initiative in the Cement sector, located in Northwest Territories, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of constructing a new power plant to replace the existing plant that was originally built in 1975 and has been deemed as inefficient and past its lifespan. The Project scope includes the decommissioning and removal of the old power plant and then the construction of the new plant at the same site. The new power plant will be built on a substructure frame to reduce ground movement issues in the future, while maintaining the existing concrete pad, which will ensure the new plant is able to adapt to the impacts of climate change. Moreover, various operational elements of the old plant, such as electrical equipment, heating systems, and indoor fuel storage tanks will be updated to meet current building code requirements. During the construction, redundant mobile generation will be used in order to continue a stable electrical source so that continuity is maintained for all dependent on the power plant. The project aims to address issues of inefficiency, safety, reliability and ground stability of the existing plant by ensuring the new asset meets modern codes and standards for electrical safety, and will result in an additional 0.6 kilowatt-hour per litre of electricity generation output from the plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data