logo
ProjectIn Progress

New Diesel Power Plant Construction in Sachs Harbour

Sector: Cement • Location: Northwest Territories, Canada

Source: Infrastructure Canada

The project consists of constructing a new power plant to replace the existing plant that was originally built in 1975 and has been deemed as inefficient and past its lifespan. The Project scope includes the decommissioning and removal of the old power plant and then the construction of the new plant at the same site. The new power plant will be built on a substructure frame to reduce ground movem

Status
Under Construction
Sector
Cement, Power Generation (CCGT), Commercial, Seaport, Government
Location
Northwest Territories, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about New Diesel Power Plant Construction in Sachs Harbour

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “New Diesel Power Plant Construction in Sachs Harbour” is an infrastructure initiative in the Cement sector, located in Northwest Territories, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of constructing a new power plant to replace the existing plant that was originally built in 1975 and has been deemed as inefficient and past its lifespan. The Project scope includes the decommissioning and removal of the old power plant and then the construction of the new plant at the same site. The new power plant will be built on a substructure frame to reduce ground movement issues in the future, while maintaining the existing concrete pad, which will ensure the new plant is able to adapt to the impacts of climate change. Moreover, various operational elements of the old plant, such as electrical equipment, heating systems, and indoor fuel storage tanks will be updated to meet current building code requirements. During the construction, redundant mobile generation will be used in order to continue a stable electrical source so that continuity is maintained for all dependent on the power plant. The project aims to address issues of inefficiency, safety, reliability and ground stability of the existing plant by ensuring the new asset meets modern codes and standards for electrical safety, and will result in an additional 0.6 kilowatt-hour per litre of electricity generation output from the plant.

Original sector

Green Energy

Budget

Location

Country

Canada

State

Northwest Territories

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Power Generation (CCGT), Commercial, Seaport, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project