New Dredger Delivery to Guerrini Marine Construction, South Africa
Completed · South Africa · Last reported Aug 2025
Source: Baird Maritime
Guerrini Marine Construction in Cape Town, South Africa, received a new dredger built by Royal IHC of the Netherlands. The dredger is tasked with removing approximately 364,000 cubic metres of organic sludge and fines from a 250-hectare freshwater lake. Royal IHC installed a booster to enable material transport over 2.7 kilometres to the discharge site.
- Status
- Closed
- Sector
- Seaport
- Location
- Cape Town, South Africa
- Updated
- 22 Jul 2026
- Source
- Baird Maritime
ConstructChat
Ask ConstructChat about New Dredger Delivery to Guerrini Marine Construction, South Africa
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Guerrini Marine Construction in Cape Town, South Africa, received a new dredger built by Royal IHC of the Netherlands. The dredger is tasked with removing approximately 364,000 cubic metres of organic sludge and fines from a 250-hectare freshwater lake. Royal IHC installed a booster to enable material transport over 2.7 kilometres to the discharge site. |
Original sector | Marine Projects |
Location
Country | South Africa |
City | Cape Town |
Source
Source | Baird Maritime |
URL |
More Details
Record type | Project |
Sector | Seaport |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
