logo

new edUcation systeM for Electric access developMEnt in tanzania

Sector: Power Generation (CCGT) • Location: Italy, Cyprus, Tanzania

Source: EU Funding & Tenders Portal

Project
Ongoing

The aim of UMEME capacity building project is to enhance the university education system for Tanzanian electrical/energy engineers, to enable universal access to electricity and energy transition in Tanzania, within the framework of the UN-SDGs. Tanzania has a population of 60 million, expected to double up by 2040, and 1 million young people entering the job market every year, of which 3% univers

Project Information FAQ

Project Information

4 Q
The project “new edUcation systeM for Electric access developMEnt in tanzania” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Italy, Cyprus, Tanzania. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The aim of UMEME capacity building project is to enhance the university education system for Tanzanian electrical/energy engineers, to enable universal access to electricity and energy transition in Tanzania, within the framework of the UN-SDGs. Tanzania has a population of 60 million, expected to double up by 2040, and 1 million young people entering the job market every year, of which 3% university graduates, to be compared to about 50,000 new jobs created every year. Green deal and electrification are crucial to address this issue. Only 37% of the population has access to electricity, while the renewable energy potential is huge and could dramatically accelerate Tanzanian energy transition to a renewable electrical system, carbon neutral and accessible to all the population. A major obstacle to such goals is a lack of skilled electrical/energy engineers. It is estimated that the number of engineers should at least double-up and a huge gap of skills required by the energy job market should be bridged. The UMEME project aims to increase the quality of electrical engineering education, through: deeply modernizing the curricula, making them less theoretical and more practical, energy-transition-oriented, based on SDGs, integrated by soft-skills and interdisciplinary elements, strongly addressed by stakeholders, capable of responding to the needs of the labor market; b) creating 6 new innovative laboratories (3 for power system modelling, 1 wind+solar+storage, 1 electrical vehicles, 1 EV re-charging); c) innovating teaching methodologies; d) training academic staffs adequately, also through mobility. The partnership involves 5 major universities, the Tanzanian national electrical system owner/operator, the Tanzanian Engineers Registration Board and 2 innovative SMEs operating in Tanzania. The partnership is supported pro bono by international scientific, industrial and NGO organizations, (i.e. CIGRE, Magaldi group, F.Iliceto association).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data