logo

New England Revolution Soccer Stadium PPP

Sector: Stadium • Location: Everett, Massachusetts, United States of America

Source: Dodge

Project
Pre-Design

2,5000 seats on 43 acres near Everett Encore casino - parcel of 43 acres at 173 Alford St. in Everett would be removed from the river's designated port area explicitly for the purpose of creating a new professional soccer stadium and a waterfront park on a site currently occupied by a closed Mystic Generating Station power plant. To include demolition of the existing building.

Status
Prospective
Sector
Stadium, Power Generation (CCGT), Commercial, Car parking, Seaport, Automotive, Manufacturing (Industrial)
Location
Everett, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about New England Revolution Soccer Stadium PPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New England Revolution Soccer Stadium PPP” is an infrastructure initiative in the Stadium sector, located in Everett, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2,5000 seats on 43 acres near Everett Encore casino - parcel of 43 acres at 173 Alford St. in Everett would be removed from the river's designated port area explicitly for the purpose of creating a new professional soccer stadium and a waterfront park on a site currently occupied by a closed Mystic Generating Station power plant. To include demolition of the existing building.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Everett

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Stadium, Power Generation (CCGT), Commercial, Car parking, Seaport, Automotive, Manufacturing (Industrial)

Article published date

2025-08-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project