New England Wind 1 - 791 MW
Sector: Telecommunications • Location: Bridgeport, Connecticut, United States of America
Source: Dodge USA
Project 1 of the New England Wind project. 804 MW wind farm to be located about 20 nautical miles south of Martha's Vineyard. Entire project of both phases to have up to 129 wind turbines and up to 5 electrical service platforms, with generation of at least 2,036 MW and up to 2,600 MW total. With a Staging and Maintenance facility at 525 Seaview Ave in Bridgeport at Barnum Landing. Two offshore ex
- Status
- Prospective
- Sector
- Telecommunications, Wind, Raw Materials, Commercial, Car parking, Power Generation (CCGT), Power Transmission, Automotive
- Location
- Bridgeport, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New England Wind 1 - 791 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project 1 of the New England Wind project. 804 MW wind farm to be located about 20 nautical miles south of Martha's Vineyard. Entire project of both phases to have up to 129 wind turbines and up to 5 electrical service platforms, with generation of at least 2,036 MW and up to 2,600 MW total. With a Staging and Maintenance facility at 525 Seaview Ave in Bridgeport at Barnum Landing. Two offshore export cables which will make underground landfall under the Craigville Beach parking lot in the to... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Bridgeport |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Wind, Raw Materials, Commercial, Car parking, Power Generation (CCGT), Power Transmission, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
