logo

New Europe bridge

Sector: Bridge • Location: Bulgaria

Source: FCC Construction

Project
Closed

This bridge is located on the frontier between Bulgaria and Rumania and is also known as the “Bridge over the River Danube”. This grand bridge complex was designed by the Spanish engineer Carlos Fernández Casado and the FCC Construcción Technical Services.The new structure improves relations between the two countries and the people who wish to cross it can freely do so.  It is an essential connect

Project Information FAQ

Project Information

3 Q
The project “New Europe bridge” is an infrastructure initiative in the Bridge sector, located in Bulgaria. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This bridge is located on the frontier between Bulgaria and Rumania and is also known as the “Bridge over the River Danube”. This grand bridge complex was designed by the Spanish engineer Carlos Fernández Casado and the FCC Construcción Technical Services.The new structure improves relations between the two countries and the people who wish to cross it can freely do so.  It is an essential connection for the Bulgarian and Rumanian transport networks because it forms part of the Pan-European IV corridor, from Istanbul, of more than 2,000 kilometres.The works consist of the construction of a 1,791-metre long combined bridge for both road and railway traffic. It includes four lanes for road circulation, a single-track electrified railway, a bicycle lane, two pavements for pedestrians and service, all of which are on a single deck.The bridge consists of three clearly differentiated sections; the railway access viaduct on land is made up of thirteen 12-metre maximum-height piers, with twelve 40-metre long spans and one of 32 metres.  The prefabricated voussoir bridge over the non-navigable channel is formed by eight piers of variable heights between 4 and 20 metres and seven 80-metre spans and one of 52 metres. The bridge over the navigable channel, also constructed of prefabricated voussoirs, is an extradosed structure of four pylons, with heights varying between 39 and 45 metres, on pile-capped slabs of five spans of 124, 180, 180, 180 and 115 metres.The bridge accesses consist of nine kilometres of dual carriageway and seventeen kilometres of railway, with a single electrified track and industrial branches. Eight overpasses are included, two of 192 metres length and two pedestrian footbridges, together with the construction of a new international goods railway station and the reformation of the existing passenger station.Three kilometres downstream from the bridge, a purpose-built prefabrication plant was constructed, where the voussoirs were manufactured for subsequent installation in the bridge. It was necessary to construct an access port to the river, including permanent high-tonnage lifting means to supply the materials for the navigable bridge zone and maritime means.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data