New Fire Station No. 1
Closed · Ohio · Last reported Oct 2024
Source: Dodge USA
General Contract: The Owner will award a stipulated sum (single Prime) contract for construction operations as follows: 1. It is intended that one Single-Prime Contract be awarded for the work required to complete the entire project as follows: a. Sitework, General Construction, Electrical, Plumbing, Mechanical and Fire Suppression work. 2. The General Contract will consist of the following work a
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
- Location
- Lima, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Fire Station No. 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General Contract: The Owner will award a stipulated sum (single Prime) contract for construction operations as follows: 1. It is intended that one Single-Prime Contract be awarded for the work required to complete the entire project as follows: a. Sitework, General Construction, Electrical, Plumbing, Mechanical and Fire Suppression work. 2. The General Contract will consist of the following work as well as all incidental work required to accomplish the intent of these Contract Documents. a. F... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Lima |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
