New Fleming County Elementary School (Phase2)
One of 10,000+ projects Taiyo tracks in Kentucky.
Source: Dodge USA
The site will need to be graded and prepared for the construction of the new facility, including new roadways, parking areas, and sidewalks. The new construction will consist of masonry load-bearing wall, with steel columns and beams in some locations, steel bar joists, and light gage roof trusses. Exterior building materials will consist of masonry veneer, metal wall panels, metal roof panels and
- Status
- Closed
- Sector
- Commercial, Geothermal, Steel, Cement, Metal, Car parking, Automotive, Government, Education
- Location
- Flemingsburg, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Fleming County Elementary School (Phase2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The site will need to be graded and prepared for the construction of the new facility, including new roadways, parking areas, and sidewalks. The new construction will consist of masonry load-bearing wall, with steel columns and beams in some locations, steel bar joists, and light gage roof trusses. Exterior building materials will consist of masonry veneer, metal wall panels, metal roof panels and a single-ply PVC roofing system. The HVAC system will be Geothermal. An alternate for a 6,153 SF... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Flemingsburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Steel, Cement, Metal, Car parking, Automotive, Government, Education |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
