New Fort River Elementary School Construction
Sector: Metal • Location: Amherst, Massachusetts, United States of America
Source: Dodge USA
Filed Sub Bidders (FSB) for the Elevator trade category. The new Fort River Elementary School project, at 70 South East St., will replace the existing Fort River School. The new school will be constructed on the field area south of the existing school and will accommodate 575 Grade K-5 students in a new three story, steel frame,105,750 GSF Net Zero building. The existing school will remain active
- Status
- Closed
- Sector
- Metal, Steel, Education, Government, Commercial
- Location
- Amherst, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Fort River Elementary School Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Filed Sub Bidders (FSB) for the Elevator trade category. The new Fort River Elementary School project, at 70 South East St., will replace the existing Fort River School. The new school will be constructed on the field area south of the existing school and will accommodate 575 Grade K-5 students in a new three story, steel frame,105,750 GSF Net Zero building. The existing school will remain active during construction. Amherst-Pelham Regional Schools may be seeking a consultant to provide const... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Amherst |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Education, Government, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
