New Green Line Special Trackwork Improvements REBID
Sector: Consumer Products • Location: Saint Paul, Minnesota, United States of America
Source: Dodge USA
The work of this project includes construction services for: Replacement of DC-powered switch heaters and equipment with AC-powered switch heaters and any equipment, and site modifications to support the new heaters within the Rice, Minnesota, Union Depot and Downtown East interlockings on the Blue and Green Line light rail lines. New AC electric service to the sites, any associated AC transformer
- Status
- Closed
- Sector
- Consumer Products, Power Generation (CCGT), Rail, Mass Transit, Government, Commercial
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Green Line Special Trackwork Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work of this project includes construction services for: Replacement of DC-powered switch heaters and equipment with AC-powered switch heaters and any equipment, and site modifications to support the new heaters within the Rice, Minnesota, Union Depot and Downtown East interlockings on the Blue and Green Line light rail lines. New AC electric service to the sites, any associated AC transformers and support equipment including conduit. Replacement of select special trackwork components wit... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Power Generation (CCGT), Rail, Mass Transit, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
