New High School and Early College High School
Sector: Metal • Location: Camden, North Carolina, United States of America
Source: Dodge USA
The project will involve constructing a two-story building (approximately 156,000 sq. ft.), with concrete foundations, steel framing with brick veneer, TPO and metal roofing, drywall partitions, casework, and installation of various school lab, athletic, and theater equipment. The scope also includes plumbing, fire suppression, HVAC, electrical, and low-voltage systems, along with associated site
- Status
- Closed
- Sector
- Metal, Cement, Education, Power Transmission, Steel, Government, Power Generation (CCGT), Commercial
- Location
- Camden, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New High School and Early College High School
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will involve constructing a two-story building (approximately 156,000 sq. ft.), with concrete foundations, steel framing with brick veneer, TPO and metal roofing, drywall partitions, casework, and installation of various school lab, athletic, and theater equipment. The scope also includes plumbing, fire suppression, HVAC, electrical, and low-voltage systems, along with associated site work such as grading, utilities, paving, and the construction of new baseball, softball, football... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Camden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Education, Power Transmission, Steel, Government, Power Generation (CCGT), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
