logo
ProjectClosed

New Hope Road Sidewalks

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Dodge USA

The construction of this project is federally funded and shall comply with all federal requirements. The project will construct new ADA compliant sidewalks, curb and gutter, stamp concreted strip, and associated storm water structures on both sides of New Hope Road between Danforth Road and the roundabout at Campbellton at Boat Rock/New Hope Roads as better described in the construction plan, The

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
Location
South Fulton, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about New Hope Road Sidewalks

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Hope Road Sidewalks” is an infrastructure initiative in the Water Supply and Storage sector, located in South Fulton, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The construction of this project is federally funded and shall comply with all federal requirements. The project will construct new ADA compliant sidewalks, curb and gutter, stamp concreted strip, and associated storm water structures on both sides of New Hope Road between Danforth Road and the roundabout at Campbellton at Boat Rock/New Hope Roads as better described in the construction plan, The approximate distance of the project is 1.8 miles

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

South Fulton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project