logo
ProjectPlanned

New HSG Campus Timber Construction

The owner, status and timeline of this project. A free account opens every field.

Source: blue News

The new campus of the University of St. Gallen will be built as a timber construction with space for 3,000 students. The project includes a main usable area of 12,000 square meters and is planned to be completed in 2032. The total project cost was determined in 2019 to be 207 million Swiss francs.

Status
Prospective
Sector
Forest Products and Packaging, Education
Location
St. Gallen, Switzerland
Updated
19 Nov 2026
Source
blue News

ConstructChat

Ask ConstructChat about New HSG Campus Timber Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New HSG Campus Timber Construction” is an infrastructure initiative in the Forest Products and Packaging sector, located in St. Gallen, Switzerland. Taiyo aggregates data on it from blue News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The new campus of the University of St. Gallen will be built as a timber construction with space for 3,000 students. The project includes a main usable area of 12,000 square meters and is planned to be completed in 2032. The total project cost was determined in 2019 to be 207 million Swiss francs.

Original sector

Education

Budget

Location

Country

Switzerland

City

St. Gallen

Source

Source

blue News

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Education

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project