New I-10 Bridge in Lake Charles
Sector: Road • Location: Lake Charles, Louisiana, United States
Source: Gator 99.5
The project involves constructing a new I-10 bridge in Lake Charles, Louisiana. The new bridge will have two auxiliary lanes for entry and exit, three travel lanes on each side, and shoulders on both sides. The existing bridge will remain open during construction, and traffic will transition to the new bridge in February 2030, after which the old bridge will be demolished. Tolling will begin in Au
- Status
- Prospective
- Sector
- Road, Bridge
- Location
- Lake Charles, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Gator 99.5
ConstructChat
Ask ConstructChat about New I-10 Bridge in Lake Charles
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves constructing a new I-10 bridge in Lake Charles, Louisiana. The new bridge will have two auxiliary lanes for entry and exit, three travel lanes on each side, and shoulders on both sides. The existing bridge will remain open during construction, and traffic will transition to the new bridge in February 2030, after which the old bridge will be demolished. Tolling will begin in August 2031, with rates based on the Consumer Price Index. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Lake Charles |
Source
Source | Gator 99.5 |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2025-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
