New I-80/I-680/SR-12 Interchange Package 7
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This final package will construct three connectors, one from eastbound I-80 to southbound I-680, one from northbound I-680 to westbound I-80, and one from westbound SR 12 to southbound I-680. The first two connectors will be low-volume ramps that complete the I-80/I-680 interchange component of this project. Constructing the northbound I-680 to westbound I-80 connector will require replacement of
- Status
- Failure
- Sector
- Road, Rail, Bridge, Tunnel, Commercial
- Location
- Fairfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New I-80/I-680/SR-12 Interchange Package 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This final package will construct three connectors, one from eastbound I-80 to southbound I-680, one from northbound I-680 to westbound I-80, and one from westbound SR 12 to southbound I-680. The first two connectors will be low-volume ramps that complete the I-80/I-680 interchange component of this project. Constructing the northbound I-680 to westbound I-80 connector will require replacement of the Union Pacific Railroad (UPRR) Cordelia Underpass, including new track. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fairfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Bridge, Tunnel, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
