logo

New Indianapolis Monon Bridge

Sector: Government • Location: Indianapolis, Indiana, United States of America

Source: Dodge

Project
Closed

Professional engineering consulting firm to provide design of the new grade separation structure for the Monon Trail and 86th Street. The selected firm shall provide design services for the new structure and approaches. The work may include any or all the following services: preliminary engineering, NEPA environmental document preparation, permitting, topographic/route survey, trail and bridge des

Status
Closed
Sector
Government, Bridge, Road, Power Transmission, Car parking, Automotive, Commercial, Power Generation (CCGT)
Location
Indianapolis, Indiana, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about New Indianapolis Monon Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Indianapolis Monon Bridge” is an infrastructure initiative in the Government sector, located in Indianapolis, Indiana, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Professional engineering consulting firm to provide design of the new grade separation structure for the Monon Trail and 86th Street. The selected firm shall provide design services for the new structure and approaches. The work may include any or all the following services: preliminary engineering, NEPA environmental document preparation, permitting, topographic/route survey, trail and bridge design, construction documents, maintenance of traffic, right of way engineering, utility coordinati...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Indiana

City

Indianapolis

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Bridge, Road, Power Transmission, Car parking, Automotive, Commercial, Power Generation (CCGT)

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project