New Labasa Bridge Replacement
Sector: Bridge • Location: Labasa, Fiji
Source: FBC News
Plans to replace the ageing bridge in Labasa with a new bridge that will improve traffic flow and support development in the Northern Division. The new bridge will be built about 1.2 metres higher than the existing structure to improve flood clearance and account for future sea-level rise. An additional bridge will be constructed upstream near Naqai Village to provide access during construction. C
- Status
- Prospective
- Sector
- Bridge, Road
- Location
- Labasa, Fiji
- Updated
- 22 Jul 2026
- Source
- FBC News
ConstructChat
Ask ConstructChat about New Labasa Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Plans to replace the ageing bridge in Labasa with a new bridge that will improve traffic flow and support development in the Northern Division. The new bridge will be built about 1.2 metres higher than the existing structure to improve flood clearance and account for future sea-level rise. An additional bridge will be constructed upstream near Naqai Village to provide access during construction. Construction is expected to begin in 2027 and take three to four years to complete. |
Original sector | Transport |
Location
Country | Fiji |
City | Labasa |
Source
Source | FBC News |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
